High grade mineralization extends from surface and dips to the NNE, and plunges to the N. The average thickness is approximately 22m, but increases down dip. Adriatic are currently drilling down plunge into their recently acquired extended concession area.
Drilling continues to demonstrate exceptional grade, continuity and thickness:
- BR-01-17 64m @ 8.4% Zn, 5.1% Pb, 373g/t Ag, 2.3g/t Au, 0.9% Cu, and 44% BaSO4 from 178m
- BR-02-18 64m @ 10.8% Zn, 7.7% Pb, 537g/t Ag, 4.6g/t Au, 0.9% Cu, and 46% BaSO4 from 214m
- BR-05-18 66m @ 12.8% Zn, 8.6% Pb, 158g/t Ag, 2.1g/t Au, 2.3% Cu, and 37% BaSO4 from 210m
- BR-22-18 42m @ 14.1% Zn, 8.4% Pb, 245g/t Ag, 5.7g/t Au, 1.4% Cu, and 34% BaSO4 from 222m
- BR-25-18 42m @ 12.7% Zn, 9.6% Pb, 309g/t Ag, 4.1g/t Au, 1% Cu, and 40% BaSO4 from 218m
- BR-36-18 42m @ 18.3% Zn, 10.7% Pb, 211g/t Ag, 2.5g/t Au, 2.5% Cu, and 25% BaSO4 from 206m